海上220 kV海缆操作过电压研究

Study on operation overvoltage of 220 kV submarine cable

  • 摘要: 海上平台电力系统是整个海上油气田开发工程中不可或缺的一部分,其中海缆作为电力系统的重 要组成之一,肩负着输送电能,并将系统中各个设备连接成完整有机体的重要任务,其安全性与运行可 靠性对于整个海上油气田平台至关重要。针对此,结合渤海海域某海上平台开发方案,基于 CloudPSS 云平台对不同短路容量下海缆合闸过电压进行仿真分析,并引入并联电抗器抑制其合闸过电压,为海洋 工程电力系统海缆选型与参数设定提供理论依据。

     

    Abstract: The offshore platform power system is an indispensable part of the entire offshore oil and gas field development project. The submarine cable, as one of the important components of the power system, is responsible for transmitting electrical energy and connecting various devices in the system into a complete organism. Its safety and operational reliability are crucial to the entire offshore oil and gas field platform. In view of this, based on the development plan of an offshore platform in the Bohai Sea, the closing overvoltage of the submarine cable under different short-circuit capacities is simulated and analyzed based on the CloudPSS cloud platform, and shunt reactor is introduced to suppress the closing overvoltage, which provides a theoretical basis for the selection and parameter setting of submarine cables for marine engineering power systems.

     

/

返回文章
返回