乌兹风电场SCADA系统配置介绍和优化研究

The introduction and optimization research on the configuration of the SCADA system for Uzbekistan wind farm

  • 摘要: 升压站是风电场的重要组成部分,升压站数据的可靠性和准确性至关重要。乌兹别克斯坦1 GW风电项目和 500 kV接入工程的顺利落地,无论在规模上还是技术难度上,都是该国风电领域的里程碑突破。通过研究乌兹风电 升压站SCADA系统的配置,深入了解本地化特色的SCADA网络架构,同时开展优化配置以满足用户网络安全与 基于外网应用方面的需求,有利于熟悉当地电网公司的要求并积累经验,完善并提高自身技术水平。

     

    Abstract: The substation is a crucial component of the entire wind farm, and the reliability and accuracy of its data are of utmost importance. The successful implementation of the 1 GW wind power project and its snpporting 500 kV grid connection project in Uzbekistan, both in terms of scale and technical complexity. By studying the configuration of the SCADA system in Uzbekistan’s wind power substation, we can gain an in-depth understanding of the SCADA network architecture with local characteristics, as well as optimize its configuration to meet user requirements for cyber-security and applications based on the external network. It is beneficial for us to familiarize ourselves with the local grid company requirements and accumulate experience in the related power projects in Uzbekistan, so as to perfect and improve our own technical level.

     

/

返回文章
返回