高比例光伏接入条件下10 kV配电网短路故障分析与智能保护方法研究

Research on short-circuit fault analysis and intelligent protection method of 10 kV distribution network with high-proportion photovoltaic integration

  • 摘要: 随着城乡配电网分布式光伏并网规模持续增长,高比例新能源接入改变了10 kV配电网传统的单电源辐射供 电方式,网架转变为多电源混供的复杂形态。网架重构后,短路故障特征与以往差异显著,传统分段过电流保护频 繁出现误动作、拒动作或越级跳闸,严重威胁电网安全稳定运行。针对高比例分布式光伏接入导致10 kV配电网短 路故障特征畸变、传统保护频繁失效的问题,量化揭示了电流分流、助增、反向三类典型效应的影响规律。构建融 合电流幅值、电流电压相位差及暂态能量熵的改进随机森林故障识别模型,引入特征权重自适应调整机制,解决单 一特征识别精度不足的问题。提出“分段自适应定值整定+就地-区域分布式协同”的智能保护架构方案,该方案 在某城区配电网改造工程中得到应用验证,结果表明:短路故障平均隔离时间由38 min缩短至8 s,保护误动作、 拒动作现象完全消除,供电可靠性提升至99.97%,可为城乡配电网高比例新能源安全并网提供技术参考。

     

    Abstract: With the continuous expansion of grid-connected distributed photovoltaic capacity in urban and rural distribution networks, high-penetration new energy sources have completely changed the traditional single-source radial power supply mode of 10 kV distribution networks, transforming the grid structure into a complex multi-power hybrid supply system. After grid reconfiguration, the characteristics of short-circuit faults differ greatly from those in the past. Conventional sectional overcurrent protection frequently suffers from maloperation, failure to operate and tripping escalation, which seriously endangers the safe and stable operation of power grids. Aiming at the distortion of short-circuit fault characteristics and frequent failures of traditional protection caused by the integration of high-proportion distributed PV, this paper quantitatively reveals the influence laws of three typical effects: current shunting, current infeed and reverse current. An improved random forest fault identification model is established by combining current amplitude, phase difference between current and voltage, and transient energy entropy. An adaptive feature weight adjustment mechanism is introduced to address the low identification accuracy of single features. Furthermore, an intelligent protection architecture adopting sectional adaptive setting + local- regional distributed coordination is proposed. The proposed scheme has been applied and verified in the reconstruction project of 10 kV urban distribution feeders. The average isolation time of short-circuit faults is reduced from 38 min to 8 s. Maloperation and failure to operate of protection devices are completely eliminated, and the power supply reliability reaches 99.97%. The research results can provide technical references for the safe grid connection of high-proportion new energy in urban and rural distribution networks.

     

/

返回文章
返回