核电厂500kV GIL和高压电缆选择

Selection of 500kV GIL and high-voltage cables for nuclear power plant

  • 摘要: 核电厂以发电机变压器组单元接线升压接至厂内500kV 主开关站,通过厂内500kV 主开关站接入当地电网。其中,主变压器与500kV 主开关站的连接有多种方式可以选择。随着500kV 高压电缆技术日趋成熟,应用愈加广泛,根据收集的现场经验反馈及设备资料,对核电厂采用500kV 气体绝缘管道母线(GIL)和500kV 高压电缆两种连接方式进行详细比较说明,在技术、经济方面给出选择建议。

     

    Abstract: The nuclear power plant is connected to the 500kV main switch station through the connection of the generator-transformer unit, and then connected to the local power grid through the 500kV main switch station. There are multiple ways to connect the main transformer to the 500kV main switch station. With the increasing maturity and widespread application of 500kV high-voltage cable technology, this article provides a detailed comparison and explanation of two connection methods for nuclear power plants: 500kV Gas Insulated Line (GIL) and 500kV high-voltage cable, based on collected experience feedback and equipment data. Technical and economic recommendations are given.

     

/