电气自动化技术在110 kV及220 kV电网规划中的应用研究

Research on the application of electrical automation technology in 110 kV and 220 kV power grid planning

  • 摘要: 随着区域负荷持续增长与网架结构不断调整,110 kV及220 kV电网规划面临供电层级衔接、站网规模匹配、 运行方式校核和自动化系统统筹配置等多重要求。以110 kV及220 kV电网为研究对象,围绕电气自动化技术在规 划阶段的嵌入应用展开分析,从负荷分区识别、变电容量测算、调度系统配置、保护逻辑衔接、通信链路设计及规 划方案校核等方面进行系统梳理,构建覆盖规划前端识别、规划过程配置与规划后段验证的研究框架。研究表明, 将电气自动化技术前置融入电网规划过程,有助于提升规划参数的判定精度,增强网架结构的协调程度,改善后续 运行方式与建设实施之间的衔接关系,可为110 kV及220 kV电网规划提供更具工程针对性的技术参考。

     

    Abstract: With the continuous growth of regional load demand and ongoing adjustments to grid structure, the planning of 110 kV and 220 kV power networks faces multiple requirements, including coordination between supply voltage levels, matching of substation and network scale, verification of operating modes, and integrated configuration of automation systems. This paper takes 110 kV and 220 kV power grids as the research objects and analyzes the embedded application of electrical automation technology in the planning stage. It systematically examines aspects such as load zoning identification, substation capacity estimation, dispatching system configuration, protection logic coordination, communication link design, and planning scheme verification. A research framework is constructed that covers pre-planning identification, planning-stage configuration, and post-planning validation. The study concludes that integrating electrical automation technology into the early stages of power grid planning helps improve the accuracy of planning parameter determination, enhances the coordination of grid structures, and strengthens the linkage between subsequent operation modes and construction implementation, thereby providing more engineering-oriented technical references for 110 kV and 220 kV power grid planning.

     

/

返回文章
返回